WPS Master Planning: Fall 2023 Preliminary Options

Conceptual Option Overview

These preliminary options were built by the Wyoming Primary Schools Facilities Steering Committee. They were presented to the community at a forum on October 30, 2023, and through electronic communication tools in the days after. Feedback was gathered at the forum and through an online survey.

All 2023 Preliminary options address accessibility needs and include:

  • Safety and security improvements.
  • A new school at the Hilltop site (due to current safety, security and accessibility issues that cannot be addressed with a renovation).
  • The addition of intervention/special education/small group spaces and specials classrooms.
  • A flex classroom at each building.
  • The following gym/cafeteria set up due to space and budget constraints:
    • Elm & Vermont would have a combined gym and cafeterian space with a stage
    • Hilltop would have a separated gym and cafeteria with a stage
  • The need for temporary schools/swing space during construction.

Click the following links to see:

Conceptual Options

Frequently Asked Questions